Yarn Demand and Knitting Time in PPS
Create order and determine yarn demand:
- 1
- Specify the quantity.
- 2
- Click (2) in order to get the production time detected.
- 3
- Click Yarn Consumption (3) in order to get the yarn demand detected.
- For planned orders the required data are all available.
- For unplanned orders the calculated total figures are missing.
Checking the inventory on hand for this production:
Call-up the
-> -> desired order -> Context menu
Assigning afterwards the yarn IDs in the PPS:
For patterns without yarn IDs out of the M1plus it is possible to assign afterwards yarn IDs in the PPS.
Example:
The yarn ID for yarn carrier 4A is missing.
- 1
- Enter the yarn ID (e.g. Winter 2018) in the marked field.
- PPS saves this allocation for this pattern for further orders with this pattern.
Determining the time-related yarn demand for the timely provisioning:
For patterns with yarn information, the yarn quantity that must be provided in specific time intervals of the production.
- 1
- Configure the report as follows.
- 2
- Create Report.
- Result with total yarn demand and yarn demand for each of the days in the specified time period: