Yarn Demand and Knitting Time in PPS

Create order and determine yarn demand:

    1
    Specify the quantity.
    2
    Click (2) in order to get the production time detected.
    3
    Click Yarn Consumption (3) in order to get the yarn demand detected.
  1. For planned orders the required data are all available.
  2. For unplanned orders the calculated total figures are missing.

Checking the inventory on hand for this production:

Call-up the Total yarn demand context menu of the order.
Order -> Disposition -> desired order -> Context menu Total yarn demand

Assigning afterwards the yarn IDs in the PPS:

For patterns without yarn IDs out of the M1plus it is possible to assign afterwards yarn IDs in the PPS.

Example:
The yarn ID for yarn carrier 4A is missing.

    1
    Enter the yarn ID (e.g. Winter 2018) in the marked field.
  1. PPS saves this allocation for this pattern for further orders with this pattern.

Determining the time-related yarn demand for the timely provisioning:

For patterns with yarn information, the yarn quantity that must be provided in specific time intervals of the production.

    1
    Configure the report as follows.
    2
    Create Report.
  1. Result with total yarn demand and yarn demand for each of the days in the specified time period: