Changing the sequence of the orders planned/released on a Machine
The dispatcher determines when and with which sequence the orders are to be produced on the machines. On the machines, the orders are arranged in the sequence of their planning or release. The dispatcher can change the sequence of orders with the Scheduled or Released sequence by means of the STOLL PPS, moving the orders in the queue of each machine
- You are signed in.
- 1
- Select in the main menu
- 2
- Select the tab of the 2nd level.
- The scheduling view appears.
The orders are displayed in a list on the left (1).
On the right is the machine list (3) with the scheduling timeline (4).
Between both views there is the toolbar of the scheduling (2). - 3
- Select an order.
Use the order filter options for this. - 4
- Select an order with the Scheduled or Released status.
- 5
- Click the Move button in the toolbar of the disposition.
- Toolbar with the following functions appears:
- [<: Move the order on the machine completely forward
- <: Bring the order on the machine one step forward
- >: Move the order on the machine one step backward
- >]: Move the order on the machine completely backward
- 1
- Select the desired action in the toolbar.
- The order will be moved forward or backward according to your specifications.
: In case it is about an distributed order, its tickets can be allocated to several machines. The action applies to several machines then.
The tickets of the order will be accordingly moved forward or backward on all affected machines as far as possible.
: In case of an order or ticket released on a machine, the PPS carries out this action on the machine. The feedback in the PPS can be delayed by this.