Company calendar
The company calendar of the STOLL PPS enables the convenient recording and visualization of working days and work-free periods (e.g. holidays). The time management from the Shift planning is the basis for the company calendar.
Considering the real working times, a more accurate forecast is possible especially for long-term orders - also a better reaction to shiftings that lead to non-compliance with deadlines. When distributing the orders they can not be scheduled for times, when the company operations are shut down.
These deviating operating times have a higher weighting than the subordinate shift times. They are available in the form of a list, which the administrator can edit. The list contains time periods with date and time where production takes place in spite of the deviating regular operation or does not take place in spite of the regular operation. The recorded operating times will be processed in an order established by the administrator since they are important for the interpretation of the operating times.
IMPORTANT: The STOLL PPS considers the information about the shift system for the forecast. Break shifts and so-called unman shifts, when the machines are without supervision of operators remain producing until the stand still are taken into account with the help of an Efficiency factor and the information, whether a shift is manned.
Additional Information
- Scenarios
- Recording the operating time specification
- Displaying operating times graphically
- Viewing shift times
- Recording the operating time specification
- Editing the operating time specification
- Deleting the operating time specification
- Changing the order of the existing operating time specifications
- Filtering by valid operating time specifications
- Determining the production capacity