Designing a new cabeling for networking

  1. Ground plan of the facilities with all electrical and constructional connections
    1
    Define a contact person of your company for the teamwork with Stoll and your local network supplier.
    2
    Make a list of all units you plan to put into a network.
    For example: Knitting machines, Stoll pattern workstations and analysis computers with Stoll-knit report.
    3
    Arrange these units in the ground plan mentioned above.
    4
    Make an enquiery to one or more local supplier on base of this information and regarding the relevant standards.
    5
    Arrange contractual with the supplier that a prooved network is handed over to you.
    6
    Let hand out to you a signed test certificate. Only in this case Stoll can take over liable a service order for the Stoll components within your network.
    7
    Synchronize the installation by your supplier with the desired service encouragement of the Stoll company.
    8
    Send the actual ground plan with positioning of the units, the cabeling and the allocated IP-addresses to the Stoll helpline after the planing with your supplier has been done.

Stoll recomments a production network according to this instruction.
If you want to use an other than the recommended network configuration, e.g. in order to integrate the Stoll components into an existing network, then you have the full responsability for this configuration and its maintenance.

All network components of third-party suppliers are subject to technical changes and are named exemplarily only.

Enlargement of an existing cabeling:

    1
    Proceed as for a new cabeling.
    2
    Insist on a test certificate.
    3
    Inform the Stoll helpline about the changes made.