Production information

This icon shows you that the order consists of one knitting program.
Example:

Quantity of run-throughs

Example: Run-through 2 of 12
2 = currently the second run-through is being knitted
12= a total of 12 run-throughs are to be knitted

Set the counting method of the run-throughs

Name of the knitting program

Course counter (1 course = 2 rows)

Current cycle

Example: RS2=7/10
Cycle counter 2 (RS2) is repeated 10 times in total, currently the seventh repetition is in progress.

Current Sintral line

A change was made (manually or automatically), which has not been yet saved (Setup, Sintral, Jacquard).

If you want to load a new order, you will be asked, whether the changes are to be saved.

If you load an older Setup file of the OKC machines, the default values will automatically be entered in the Ua-b/NCC tab - therefore, this icon appears.

The production was interrupted.

The order looks like this, for example:

This icon shows you that the order consists of several knitting programs.
Example:

Quantity of run-throughs

Example: Run-through 2 of 12
2 = currently the second run-through is being knitted
12= a total of 12 run-throughs are to be knitted

Set the counting method of the run-throughs

Quantity of the fabrics for this position

Example: 1 of 5
1 = currently the first piece is being knitted
5 = a total of five fabrics are to be knitted

Name of the current position (knitting program)

Example: 2 of 3
2 = currently the second position is being knitted
3 = the order consists of of a total of three positions

Course counter (1 course = 2 rows)

Current cycle

Example: RS2=7/10
Cycle counter 2 (RS2) is repeated 10 times in total, currently the seventh repetition is in progress.

Current Sintral line

A change was made (manually or automatically), which has not been yet saved.

If you want to load a new order, you will be asked, whether the changes are to be saved.

If you load an older Setup file of the OKC machines, the default values will automatically be entered in the Ua-b/NCC tab - therefore, this icon appears.

The production was interrupted.

The order looks like this, for example: