Set Loading Options

Opções de carregamento

  1. In the Create new order window, the setting 2. Loading Options must be selected.
    1
    If necessary, switch to 2. Loading Options with the buttons.
  1. The window is displayed.

 

1

Loading Options for All Positions:

 

EAY

The deletion of the yarn carrier home position is performed only for the first order position.

: Then, EAYSEQ is executed when changing to the next order position.

EAYSEQ

Delete yarn carrier home position after each position of the order (knitting program).

: This function is only active, if two or more positions (knitting programs) are selected for the order.

Use Master Setup:

Setting for using a Master-Setup.

: This function is only active, if two or more positions (knitting programs) are selected for the order.

A

Button for selecting the location (path) of the desired Master Setup.

B

Do not use Master Setup

Use Master Setup

 

2

Loading Options for Individual Positions

 

Name

 

 

SIN

JAC

SET

 

 

List of all selected knitting programs

The program element is switched on (active), i.e. it is used for the production (default setting).

The program element is switched off (inactive), i.e. it is not used for the production.

Symbol for using a Master-Setup in the SET column.

 

: You can individually switch on or off these program elements.

 

    2
    Selection of all required loading options:
    3
    Press the Create order button to complete the order and to return to the previous window.
  1. The order is created with several knitting programs.

-  or  -

    4
    With the Cancel button, cancel the process and return to the previous window.
  1. Create order is canceled without loading a new knitting program.