Monitor the production with one knitting program

Monitor Production:

  1. You are signed in as Senior Operator .
    Monitor Production can also be performed by the Operator.
  2. An order is set-up and started.
    1
    In the main navigation bar select the main area Produce Order.
    2
    Tap Monitor production in the bottom navigation bar.
  1. The window for Monitoring the currently knitting fabric is displayed.
Symbolic picture
Symbolic picture

No.

Key

 

1

 

Display of the running time per fabric piece still nn of xx with progress display (green bar)

  • nn : Remaining running time of the fabric piece
  • xx : Total running time of the fabric piece

2

Completed on

Completion of the current position (plus re-knitting of fabric pieces)

  • Date
  • Time of Day

3

Carriages

Current carriage speed m/s with display of

  • carriage direction toward left / toward right
  • Display of with the activated Reduced speed [ML] button

4

Fabrics of Position z

    n of m

Display of the number of fabrics per position z (knitting program) in the run-through n of m

  • z = Position number = Sequential number of the knitting programs of the order
  • n = Number of completed fabrics of the current position
  • m = Total of fabrics to be knitted per position (knitting program)
  • + x = Number of fabrics to be re-knitted of the current position

: If several knitting programs are 'running through', the display corresponds to the piece counter for the corresponding position (knitting program).

5

Cycle Counters

Display of the current cycle counter RSn = x / y

  • n : Number of the cycle counter
  • x : still remaining repetitions
  • y : total number of repetitions

6

Racking

Display of the current racking position

7

Take-down

Display of the current take-down value

9

Stitch length

Opening the dialog for changing the current stitch length

10

Yarn Carriers

Opening the Yarn carrier window with the graphic representation of the active yarn carrier

 

    3
    Tap the desired button to change the corresponding value.
  1. The changes will be entered in Setup.