Start Production
Start production:
- You are signed in as Senior Operator 
. 
- 1
 - In the main navigation bar select the main area 
 Set up Order. - 2
 - Tap on 
 Edit order in the bottom navigation bar. 
- The window is displayed.
 

2  | Button for starting the production with the line number specified under ((3)). 
  | 
3  | Display of the Sintral line number, at which the knitting program will be started.  | 
- 3
 - If necessary, specify the desired line number for the production start under ((3)).
 - 4
 - Press the 
 Start production button: 
- Production will get started without executing TP (Test Program).
 
Execute Test Program (TP) on the machine:
- You are signed in as Senior Operator 
. - A knitting program is loaded.
 
 Set up Order main area is selected in the main navigation bar.
- 1
 - Tap on 
 Edit Pattern in the bottom navigation bar. - 2
 - Open the 
  tab then. - 3
 - Tap the 
  Start Test [TP] button. - The knitting ability of the knitting program will be checked.
 - 4
 - If TP ok, you can directly start the production by the 
 Start production button. 
: No TP is carried out automatically.