Start Production
Start production:
- You are signed in as Senior Operator .
- 1
- In the main navigation bar select the main area Set up Order.
- 2
- Tap on Edit order in the bottom navigation bar.
- The window is displayed.
2 | Button for starting the production with the line number specified under ((3)). : No TP is carried out automatically. |
3 | Display of the Sintral line number, at which the knitting program will be started. |
- 3
- If necessary, specify the desired line number for the production start under ((3)).
- 4
- Press the Start production button:
- Production will get started without executing TP (Test Program).
Execute Test Program (TP) on the machine:
- You are signed in as Senior Operator .
- A knitting program is loaded.
- Set up Order main area is selected in the main navigation bar.
- 1
- Tap on Edit Pattern in the bottom navigation bar.
- 2
- Open the tab then.
- 3
- Tap the Start Test [TP] button.
- The knitting ability of the knitting program will be checked.
- 4
- If TP ok, you can directly start the production by the Start production button.