Horizontal adjustment of a yarn carrier
Adjust yarn carrier horizontally
This adjustment of the yarn carrier is machine related!!
Additional pattern related adjustments may be required.
- You are signed in as Senior Operator
.
- Knitting program is loaded.
- The production was started.
- 1
- In the main navigation bar select
Maintain Machine.
- 2
- Select
Service in the bottom navigation bar.
- 3
- Tap the
Yarn carrier key button.
- 4
- Select the
Adjust Horizontally tab.
- The menu appears.
![](../Images/png/9357738635__Web.png)
1 | Button Move to First Position in order to move the yarn carrier to the first position
The identification of the | |
2 | Button Move to Last Position in order to move the yarn carrier to the last position | |
3 | Buttons for positioning the yarn carrier | |
Large step width for moving the yarn carrier to the left | ||
Small steps for moving the yarn carrier to the left | ||
Small steps for moving the yarn carrier to the right | ||
Large step width for moving the yarn carrier to the right | ||
4 | Button for confirming the corrected position as Apply first position.
|
- 1
- Select the yarn carriers to be adjusted.
- 2
- Press the
Move to First Position button.
- The yarn carrier is located in the needle bed on the first position (first needle).
- Yarn carrier out of the left clamping and cutting device on first position at the left in the needle bed.
- Yarn carrier out of the right clamping and cutting device on first position at the right in the needle bed.
- 1
- With the help of the arrow keys move the yarn carriers until the yarn carrier tip is centered to the first needle.
- 2
- Tap on the
Confirm first position button
- The setting is confirmed and the yarn carrier is adjusted.
- The yarn carrier automatically runs into its starting position.