Lubrication
With this menu you confirm the corresponding lubrication process:
Racking Spindle | |
Days Prior to Next Greasing |
Display of the time (by days) until the next lubrication process. |
Confirm Greasing |
Click this button only if the greasing process actually was performed. In case of insufficient grease, there is the risk of damaging the racking spindle. An irreversible damage of the racking spindle is possible!
|
Racking Spindle | |
Days Prior to Next Greasing |
Display of the time (by days) until the next lubrication process. |
Confirm Greasing |
Click this button only if the greasing process actually was performed. In case of insufficient grease, there is the risk of damaging the racking spindle. An irreversible damage of the racking spindle is possible!
Greasing racking device |
Needle Bed | |
System Run-throughs Prior to Next Oiling |
Displays the quantity of the system run-throughs until the next oiling of the needle bed. |
Confirm Oiling |
Tap on this button only if the oiling process actually was performed.
Oil needle bed |
Oiling Intervals Prior to Next Greasing |
After every tenth note appears a pictograph.
|
Confirm Greasing |
Click this button only if the greasing process actually was performed.
Greasing butts of the coupling parts and intermediate sliders |
Needle Bed | |
System Run-throughs Until Lubricating Process |
Displays the quantity of the system run-throughs until the next oiling of the needle bed. |
Confirm Oiling of Needle Bed |
Tap on this button only if the oiling process actually was performed.
|
Confirm Greasing of Needle Bed |
Click this button only if the greasing process actually was performed.
Greasing butts of the coupling parts and intermediate sliders |
Needle Bed | |
System Run-throughs Until Lubricating Process |
Displays the quantity of the system run-throughs until the next oiling of the needle bed. |
Confirm Oiling |
Tap on this button only if the oiling process actually was performed.
|
Confirm Greasing |
Click this button only if the greasing process actually was performed.
|
Linear Guiding of the Carriage | |
Operating Time Prior to Next Greasing |
Display of the time (by hours) until the next lubrication process. If the maximum value for the run time or the distance is reached, the machine stops. The 20657 Grease the linear guiding of the carriage message appears on the display.
|
Distance Prior to Next Greasing |
Display of the distance (in kilometers) until the next last lubrication process. If the maximum value for the run time or the distance is reached, the machine stops. The 20657 Grease the linear guiding of the carriage message appears on the display.
|
Operating Hours |
Display of the previous operating time of the carriage (operating hours counter) |
Kilometers |
Display of the traveled distance of the carriage (kilometer counter) |
Confirm Greasing |
Click this button only if the greasing process actually was performed. In case of insufficient grease, there is the risk of damaging the linear guiding. An irreversible damage of the linear guiding is possible! |
Needle Bed | |
System Run-throughs Until Lubricating Process |
Displays the quantity of the system run-throughs until the next oiling of the needle bed. |
For central lubrication Type1
Central Lubrication - Differences of Type 1, Type 2 and Type 3 | |
Trigger a Lubrication Process |
The central lubrication lubricates the whole needle bed once. |
Deaeration |
Tap here to deaerate the oil line of central lubrication. |