Monitor Order

Production data of the Entire Order

1

Running Time of the order

2

Display of the production progress for the order

3

Number of the current position (knitting program)

4

Quantity of run-throughs
Number of times that the list of positions (knitting programs) is repeated.

Example: Run-through 1 of 4 (see image)
The list is repeated four times in total. Currently the list is knitted for the first time.

Production data of the current position (knitting program)

3

Number of the position (knitting program)

5

Name of the knitting program

6

Remaining running time

7

Display of the production progress for the current position

8

Displays the following information:

  • Quantity of the completed fabrics for this position
  • Total piece quantity for this position
  • + = Quantity of the fabrics to be re-knitted, Icon

Tap here to re-knit fabrics.

Re-knitting

9

List which program parts (.sin, .jac, .setx) are used in this position.

10

Number and name of next position

11

Number and name of previous position

မက္ေဆ့ခ်္ပို႔ရန္

Opens the dialog box to send a message to the Senior Operator or the maintenance staff.

PPS – Send message

စက္ရပ္ရန္

Stopping of the machine when the set condition is fulfilled.

If you tap on the icon , you can select one of the following options:

  • ေနာက္ထပ္ ေျပာင္းျပန္ထိုးရာတြင္
    Stop machine in next carriage reversal
  • လက္ရွိ အထည္ ၿပီးသြားသည့္အခါ

You will find further possibilities for a conditional stop under:
မန္န်ူရယ္ ေျဖရွင္းျခင္း 1 -> စက္ရပ္ရန္

အရန္သင့္ဖြင့္ထားေသာ စနစ္

သတ္မွတ္ထားသည့္ အေျခအေန ၿပီးေျမာက္သြားေသာအခါ စက္ကို အရန္သင့္ဖြင့္ထားေသာစနစ္တြင္ ထားရွိေပးသည္။

If you tap on the icon , you can select one of the following options:

  • ရပ္လွ်င္
    After a stop, the standby mode is switched on.
  • X နာရီ ၾကာၿပီးေနာက္ ရပ္တန္႔မႈျဖင့္
    Enter the waiting time until the standby mode is switched on after a stop.
  • လက္ရွိ အထည္ ၿပီးသြားသည့္အခါ
  • ေအာ္ဒါ ၿပီးသြားသည့္အခါ