Create and set-up order with several knitting programs
Procedure:
- 1
- Create order with several knitting programs.
- 2
- Start the setup mode.
- 3
- Prepare the machine and set-up the pattern
- Threading up the Yarn Carriers
- Position the yarn carriers at the clamping point
- The yarn carriers are in the collecting clamp unit and are clamped.
- Check the knitting area and the fabric collection chamber
- 4
- Start production.
- 5
- Start machine (engage).
Make the following changes:
- Cycle Counters (RS)
- Stitch Length (NP)
- Fabric take-down values (WBF)
- Machine speed (MSEC)