Reference Runs
Perform the following reference runs after the installation:
- The
- 1
- Tap the button or the button.
- 2
- Start the machine with the engaging rod.
- The message for a comb reference appears.
- Observe the note!!
- 3
- With the Yes button confirm the message.
- The comb reference is performed.
- 4
- Tap on the desired carriage direction for the reference run.
- 5
- Then, start the machine again with the engaging rod.
- The carriage moves at creep speed until the reference run is carried out.
- Racking and step motor reference is performed in the right carriage reversal.
- 6
- The message window appears.
- 7
- Confirm the message with the Yes button.
- The yarn carriers to be referenced are being referenced .
- 8
- The next message appears.
- 9
- Confirm the message with the Yes button.
- Observe the note for the reference of the weave-in device!
- The weave-in devices are referenced .
- All references were performed.
- 10
- With the Close button, exit the window.
- The note for the racking reference appears in the next reversal. Please take into consideration!
Reference run racking
Ensure that the stitches of one needle bed are cast-off.
- 11
- Continue with Create Order.