Re-knitting of fabrics
- Necessary modification
 - In case of orders with only one knitting program, the number of run-throughs (piece number) can be influenced
 - In case of orders with several knitting programs, the number of fabrics per position can be influenced in the order.
 - Re-knitting of defective fabrics
 
These changes do not influence the specification entered when creating the order, since this can only be performed by the Senior Operator.
Re-knitting window
- You are signed in as Senior Operator 
.
Monitor Production can also be performed by the Operator. - An order is set-up and started.
 
- 1
 - Click the 
 button in the Monitor Order or the Monitor Production window. 
- The Re-knitting window is opened.
 

No.  | 
  | 
  | 
|---|---|---|
1  | Position  | List of the knitting programs in the current order 
  | 
2  | Finished  | Quantity of processed run-throughs  | 
3  | Order  | Total number of run-throughs 
  | 
4  | Re-knitting  | Display of the already re-knitted fabrics  | 
5  | 
  | +/- button for entering the number of fabric pieces to be re-knitted  | 
6  | 
  | Confirm the input and return to the previous window  | 
7  | 
  | Confirm the input for the first position in the list and do not exit the window to make further entries  | 
8  | 
  | Close the window without applying the entries  | 
- 2
 - Make the desired entry for the first position to be changed
 - 3
 - Press the 
 Apply button, to confirm this input and then to continue with the next entry. 
- or -
Press the
 Ok button, to confirm this input and to close the window. 
Behavior
If fabrics are entered to be re-knitted, 're-knitting' is performed immediately after completion of a currently knitting position.

 Close