Master Piece and order
Also with an order with several positions (sequences), you can work with original fabrics (Master Pieces).
- For each knitting program of the order you determine the basic conditions in the Master Piece
- You put the order together based on the knitting programs with the corresponding Master Piece data.
- The yarn lengths are controlled for each knitting program of the order with the corresponding Master Piece data during the production.
Using Master Piece data in the sequence:
- The check boxes , , are active
- Or the check box is active

- Tap the (1) key.
- The knitting program and the setup data are loaded.
- Generate the original fabric.
- If the Master Piece corresponds to your specifications, save the Master Piece data.
- Repeat these steps for all the knitting programs, which are to be put together to the sequence.
- Activate Setup2 in the window and put together the sequence.

- Return to the window.

Use YLC5 data (2) | ||
Activate the use of YLC5 data. | ||
Set=0 | only the YLC5 data is used for the sequence element. | |
Set=1 | The Setup and YLC5 data are used for the sequence element. | |
Deactivate the use of YLC5 data. |
- Make settings.
- Knit the sequence.

One setup file for all the sequence elements
The adjustment in the
shows the following procedure when sequence knitting:A setup file is loaded that is used for all the sequence elements.
(4) has to be deactivated so that the setup data will not be deleted.
Only the YLC5 data is used with all the sequence elements. Adjustment (2) and (3).
Additional Information